The US 550-US 160 Connection constructed a new 1.1-mile four lane section of US 550 to connect with the existing US 160 interchange and widen 3.3-miles south of US 550 to four lanes south to LaPlata County Road 32
This project integrated the highway into thehigh-desert mountain terrain through large-scale environmental mitigation and comprehensive site reclamation of the decommissioned corridor using native revegetation. This entailed extensive native landscape restoration on over 15 acres of pinyon-juniper forest and rehabilitation of several existing roadside scars, including transforming the old highway corridor into a natural landscape utilizing recycled on-site earthwork and native high-desert revegetation. Goodbee also provided development of aesthetic treatments for two bridges, retaining walls, a pumphouse, and roundabout. Collaboration with the landscape contractor, interdisciplinary design team, local nurseries and CDOT was a critical component for success at meeting technical and aesthetic requirements for the project.