This 8.5 BRT corridor will increase capacity and reduce travel times, improve safety and accessibility along East Colfax Avenue from Broadway to I‑225
Goodbee led the SUE investigations and utility relocation design to resolve conflicts along the corridor and at the 28 transit stations in Denver and Aurora. The project required multi-year coordination with private fiber companies, Xcel Energy, Denver Water, and DOTI infrastructure with proposed green infrastructure, traffic signals, drainage, and station platform elements.

